Hybrid OR, OR's 19, 20 & 21

This project was an interior build out of what used to be the SICU area in an existing hospital. The footprint of the new OR’s was 8,268 SF of existing space that was completely gutted and renovated. There were four new OR’s, a central sterile and an electrical room. The OR’s were outfitted with state of the art technology and equipment including light and camera booms, med gas/electrical booms, flat screen televisions and a Bose surround sound system. In the Hybrid OR, a Siemens Artis Zeego which was the first robotic C-Arm system in the world can allow doctors to perform a 360 degree visualization of inside the body in 6 seconds just like a CT scan would do all while performing surgery. This allows for better care and treatment for the patient as well as increases the possibility for less invasive surgeries. This Hybrid OR room is only one of about 100 in the United States.

 

 

 

  • Owner:
  • Private Client
  • Chattanooga, TN
  • Architect (Joint Venture):
  • Derthick Henley & Wilkerson
  • 1001 Carter Street
  • Chattanooga, TN 37402
  • Phone: 423-629-4816
  • Fax: 423-267-8830
  • Earl Swensson & Associates
  • 2100 West End Avenue
  • Suite 1200
  • Vanderbilt Plaza
  • Nashville, TN 37203