Three additions, each located at different ends of an existing campus, totaled more than 38,000 square feet. To the north, a new main three story main entrance was created adjoining the existing two story structure. The existing structure had to be completed and underpinned while new addition was being built. To the east of the campus, a new 13,000 square foot Culinary Arts Building was constructed that connected the sports facility with the classrooms of the existing building. To the south of the campus, a new audio visual addition was created to service the existing auditorium. Work was completed during normal operations.